Reliable, Trustworthy Reporting, Capturing The Heartbeat Of Our Community

Dirt work underway at Summerland site

A little rain, cold temperatures and a brisk breeze did not stop dirt work at the Summerland school site, March 25.

Since then, dirt work has continued, a new temporary driveway has been installed along Summerland Road and a retention wall was constructed.

 

Reader Comments(0)