Reliable, Trustworthy Reporting, Capturing The Heartbeat Of Our Community
A little rain, cold temperatures and a brisk breeze did not stop dirt work at the Summerland school site, March 25.
Since then, dirt work has continued, a new temporary driveway has been installed along Summerland Road and a retention wall was constructed.
Reader Comments(0)